Case study

Interlocking panel soffit lining

  1. The brief

    An interior fit out inside a Sydney landmark. The panels line soffits and wrap columns at eye level and overhead, under raking light that shows any waviness or misaligned joint.

  2. What we did

    Panel widths were set from the lighting grid so joints land where the light does not graze them. Each panel was folded to size in the workshop and clipped to a levelled sub frame instead of fixed straight to the substrate.

  3. The detail

    A soffit panel is judged from below, where the joint line is the only thing to look at. Narrow panels on a dead flat sub frame keep the reflection even along the length of the ceiling.

Have a project on the board?

Send drawings or a brief. Concept sketches are enough to get a useful answer.

  1. You send drawings or a brief

    A plan, a section and an elevation are enough.

  2. 1business day

    An estimator replies

    Named contact, not a queue.

  3. 7days

    Tender returned

    Priced by system, metal and area.