Skip to content
Standing seam facade cladding by Roofing Group at Camperdown Hotel, Camperdown

Commercial · Camperdown, NSW

Camperdown Hotel

Standing seam cladding to the upper levels of a Camperdown hotel, set against face brick and running the full length of the street elevation.

Location
Camperdown, NSW
Completed
2018
Sector
Commercial
Metal
Zinc
Finish
VMZINC Quartz
System
Standing seam
Builder
Sasco Developments

Case study

Standing seam facade cladding

  1. The brief

    A hospitality building where the top two levels are metal and the base is brick. The metal band steps around balconies and returns into deep window reveals on a long, highly visible elevation.

  2. What we did

    We drafted the elevation as one setting out so the seam grid lines through above and below every opening. Pans were folded to length and installed off a swing stage with the street kept open.

  3. The detail

    Reveals are folded, not trimmed. Each window has a head, two jambs and a sill made from the same coil as the wall, which makes the openings look cut into the metal instead of surrounded by it.

Have a project on the board?

Send drawings or a brief. Concept sketches are enough to get a useful answer.

  1. You send drawings or a brief

    A plan, a section and an elevation are enough.

  2. 1business day

    An estimator replies

    Named contact, not a queue.

  3. 7days

    Tender returned

    Priced by system, metal and area.