
Commercial ยท Surry Hills, NSW
Bing Lee Head Office
VESTIS Black Graphite standing seam carried from the walls through the soffits and fascia.
- Location
- Surry Hills, NSW
- Completed
- 2022
- Sector
- Commercial
- Metal
- Aluminium
- Finish
- VESTIS Black Graphite
- System
- Standing seam
- Builder
- Dilcara
The brief
The new floor sits on top of a heritage brick warehouse and is set back behind the parapet, so it reads as a dark object above the brickwork rather than another storey of it. It is also seen from more angles than most cladding ever is. From the footpath you look up at the fascia and the underside of the overhang. From the terrace you stand directly beneath the soffit. From the taller buildings around it you look down on the whole roof. There was no face where a joint could be tucked out of sight.
What we did
The seam module was fixed once and held across all three planes. Set each plane out from its own edge, which is the quick way, and the seams reach the corners out of step, leaving the eaves reading as a break in the line. Working to a single module instead means a seam that runs up the wall turns into the soffit and finishes on the fascia without stepping. Pans were folded to length in our Smithfield workshop.
The detail
Nothing on the new floor is face fixed. Standing seam carries its clips underneath the seam, which counts for most on the soffit: it is the surface people stand under on the terrace, and from the street it is the first part of the addition anyone sees.
Bing Lee Head Office photos
Have a project on the board?
Send drawings or a brief. Concept sketches are enough to get a useful answer.
You send drawings or a brief
A plan, a section and an elevation are enough.
- 1business day
An estimator replies
Named contact, not a queue.
- 7days
Tender returned
Priced by system, metal and area.




