Which metal cladding system should you specify?

A decision guide across the eight folded metal systems: what each one does well, what it costs in labour, and where it stops working.

Metal clad upper storey on a Russell Lea residence, set among tiled suburban roofs

Most system choices come down to three questions. How shallow is the roof plane? How large can the module be? And how much site labour is in the budget? Answer those and the field usually narrows to two.

This is a working guide to the eight systems we fold, written to be read in that order.

Start with pitch

Pitch eliminates more systems than anything else, and it does it early.

Pitch What works
1.5° and up Double lock standing seam, nail strip with the 38 mm seam
2° and up Snap lock, batten seam from 3°, single lock standing seam from 25°
30° and up Shingles in square and diamond formats
Walls only Interlocking panel, flat lock, cassette

A shallow plane is a hard constraint. Water sits longer on it, wind drives rain up the seam, and the joint has to be tight enough to resist both. That is what a double lock seam does: it is folded twice, on site, with a machine. Nothing snaps together at 1.5°.

The trap is discovering the pitch late. A facade system chosen for a wall, then asked to turn a 5° canopy at the last minute, will not do it. Check the shallowest plane in the drawing set before you choose.

Then size the module

The second question is how big a piece the elevation wants.

Long and narrow. Standing seam, snap lock and nail strip all run as continuous pans up to 8 m and beyond. The line is vertical, the module is 270 to 555 mm, and the rhythm comes from the seam spacing.

Short and wide. Interlocking panels run 190 to 390 mm and flat lock to 530 mm, both with a fine recessed joint. The face reads flat; the joint is the only line.

Large trays. Cassettes go to 875 mm wide and 4 m long with a 20 mm recess on all four sides. They are the only system that reads as a grid in both directions.

Small pieces. Shingles run from 193 mm and are laid in courses. They are the only system that will follow a dome, a cone or a turret without faceting.

Module size is not just aesthetic. A wider flat panel shows more oil canning, which is why we cap interlocking at 390 mm and flat lock at 530 mm. Cassettes get away with 875 mm because the tray is 1.5 mm thick and 26.5 mm deep, which is a different structural proposition.

Then count the labour

This is the part that rarely makes it into the specification and always makes it into the tender.

Standing seam is folded closed on site with a seaming machine. It is the most labour on the roof and the most capable system. Pay for it when the pitch is low, the form is curved, or the junctions are complex.

Snap lock closes by hand. No machine, no seaming crew, and the tray stays flatter because nothing is stressed closing the joint. It is the system for long, straightforward planes.

Nail strip is screwed straight through slotted holes in its own upstand and covered by the next panel. No clips at all. It is the fastest and cheapest of the seamed systems, and it looks like the other two from the street.

Cassette takes the most preparation and the least roof time. The aluminium subframe has to be set out accurately, but once it is up, panels clip on.

If a project is chasing programme, the honest ranking from quickest to slowest is nail strip, snap lock, interlocking, standing seam.

Where each one stops

Every system has an edge. These are the ones worth knowing before you draw it.

Standing seam cannot do a large flat module. The seam is the point.

Snap lock stops at 2°. If any plane goes shallower, you are back to double lock.

Nail strip is a coated steel and Corten system. In zinc and copper we would move you to standing seam or snap lock, because a screw through the sheet is the wrong detail for a metal that lasts a century.

Interlocking panels are walls and soffits. VMZINC publishes them as a facade system and we specify them that way.

Flat lock is also walls and soffits, on a continuous plywood deck. It gives the flattest face of any system here, with the recessed joint as the only line.

Cassette needs a subframe, which takes depth. It is the most demountable system and the least shallow.

Shingles stand only 7 mm off the substrate, which makes them the answer when the assembly is tight. But rectangles are walls and soffits only; roofs need the square or diamond formats.

Batten seam has no standard pan width at all. Batten spacing is a design decision, which is a freedom on a feature elevation and an overhead on a straightforward one.

Two comparisons that come up constantly

Standing seam or snap lock? If the pitch is 2° or steeper and the planes are simple, snap lock gives you the same look for less labour and less oil canning. If anything is curved, tapered, low pitched or heavily detailed, fold it.

Interlocking panel or cassette? Interlocking hooks edge to edge straight onto top hats, so the joint reads in one direction and the assembly stays thin. Cassette hangs on a subframe with a recess on all four sides, so the grid reads both ways and a single panel can be lifted off later. Interlocking is cheaper and thinner; cassette is larger and demountable.

What we would ask you

When a set of drawings arrives, these are the questions that decide the system, and they are worth answering before the specification is written:

  • What is the shallowest roof or canopy plane on the project?
  • Does the module have to land on anything: an opening, a floor line, a setback?
  • Is the wall assembly already fixed, and how much depth is left?
  • Is this metal expected to last 30 years or 100?
  • Who is opening it up later, and for what?

That last one decides more than it should. A facade that will be opened for services or solar wants a system that unclips.

Send drawings through and we will mark up the systems that suit each plane, with the pitch and module limits noted against them, before anything is cut. See the systems overview for the full specifications, or start a spec builder to get the details on paper.

Start your next project.

Send drawings or a brief. Concept sketches are enough to get a useful answer.

  1. You send drawings or a brief

    A plan, a section and an elevation are enough.

  2. 1business day

    An estimator replies

    Named contact, not a queue.

  3. 7days

    Tender returned

    Priced by system, metal and area.