What goes behind metal cladding: plywood, top hats and cavities

The layers behind a metal facade: structural plywood, top hats, subframes, breathable membranes and the ventilated cavity that keeps the metal dry.

Metal cladding being installed over a plywood substrate at a window reveal, with the timber framing visible

Most of the questions we get about metal cladding are about the metal. Most of the problems we get called to look at are about what is behind it.

A metal facade is a rainscreen, not a sealed skin. The panel takes the weather and most of the water. What gets past the joint runs down a membrane and out at the base, and air moving behind the panel dries the back of it. Take away the drainage path or the airflow and the metal starts corroding from the side nobody can see, which is the kind of problem that surfaces years later and costs a facade.

The two substrate families

Continuous deck. Structural plywood, 18 mm to AS 2269, fixed over studs or top hats. Used for standing seam, snaplock, flat lock, shingles and batten seam. Anything where the panel needs support across its whole width, or where clips are screwed at close centres.

Spaced rails. Galvanised top hats, or an aluminium subframe, fixed back to the structure. Used for interlocking panels and cassettes. The panel spans between rails and the depth of the rail sets the cavity.

Which one you are in changes everything downstream: how the cavity is formed, where the membrane sits, how the openings are detailed and what the builder has to have ready before we arrive.

Why the deck has to be flat

Metal describes whatever is under it. A ribbed system is forgiving because the rib carries the eye. A flat system is not.

On flat lock and shingles in particular, a deck that is 4 mm out over a metre will read in raking light as a soft wave across the elevation. It cannot be fixed by packing behind the panel. If the framing is out, the framing gets fixed before the cladding starts, and that is a conversation worth having at frame stage rather than when the panels are on site.

The membrane

A waterproof, fully breathable membrane sits over the deck or behind the cavity. Two properties matter and they pull in opposite directions: it has to shed the water that gets past the face, and it has to let vapour out of the wall.

On a fully supported assembly, where the metal sits directly on the deck, a structured membrane is often specified instead. It creates a small drainage and drying space between metal and deck so the back of the panel is not sitting against a damp board.

The cavity

The cavity is the part most often value engineered, and the part least worth losing.

Its job is drying. Air enters low, moves up behind the panel and leaves high, taking moisture with it. That keeps the back of the metal dry and keeps salts from concentrating on the hidden face. On zinc this is not optional: zinc corrodes from the back if it stays damp, and a warranty conversation with the manufacturer will come back to the ventilation path.

The depth is set by the rail or the subframe. The openings at the top and bottom have to be real, and they have to survive the flashing details at the base and the parapet.

Clip spacing and wind load

Clip and fixing centres are not a house standard. They come from the wind loads for the site, the height on the building, and whether the panel is in a corner zone where suction is highest.

Our default figures, such as clips at maximum 300 mm centres on flat lock or top hats at maximum 600 mm, are starting points. We confirm them per project against the actual exposure. On a tower corner in a high wind region the spacing tightens considerably.

The layers, in order

A typical ventilated wall, from the face inwards:

  1. Metal panel
  2. Concealed clips or a fixing flange
  3. Structural plywood or top hats, forming the cavity
  4. Ventilated cavity, open top and bottom
  5. Waterproof breathable membrane
  6. Wall structure, insulation and vapour control by others

Main structure and insulation are always by others. The interface between their work and ours is where things go wrong, so we draw it and agree it before anything is ordered.

Questions we get asked

Can metal cladding go straight onto blueboard or fibre cement? Not as a substrate for a fully supported system. It does not hold clip fixings reliably and it does not behave like a structural deck. Fix top hats or a plywood deck over it.

Does the plywood have to be 18 mm? For our fully supported systems, yes: 18 mm structural plywood to AS 2269. Thinner sheets flex between studs, which shows on the face and loosens fixings over time.

Is a cavity always needed? On a ventilated rainscreen, yes. On a fully supported assembly the drying space is created differently, usually with a structured membrane. Either way the metal needs somewhere for moisture to go. The arrangement is confirmed for each project.

Who provides the top hats and the membrane? We do, as part of the cladding package, unless the project is set up differently. The structure, insulation and any vapour control layer are by others.

What does the builder need ready before you start? A structure that is square, plumb and within tolerance, with the framing or the slab edges set out to the same drawings we folded to. Access, and a clear sequence with the window installer, because openings are where most of the coordination sits.

Can you fix cladding over an existing wall? Often, yes. A subframe or top hats take up tolerance in the wall behind, which is what makes metal cladding work on refurbishment as well as new build. The existing substrate has to be sound enough to take the fixings, and we check that before quoting.

Start your next project.

Send drawings or a brief. Concept sketches are enough to get a useful answer.

  1. You send drawings or a brief

    A plan, a section and an elevation are enough.

  2. 1business day

    An estimator replies

    Named contact, not a queue.

  3. 7days

    Tender returned

    Priced by system, metal and area.