Skip to content

Systems | | 6 min read

Batten seam: the deepest line you can fold in metal

Batten seam roofing and cladding explained: how the batten, the pan upstands and the cap work together, what spacing to set, and why the rhythm is the design.

Batten seam metal roof and clad wall running over a solar array

Every other concealed fix system we fold makes its joint out of the two panels that meet there. Batten seam does not. It puts a batten between them and closes the joint with a third piece of metal, and that is what lets the line get so much deeper than a seam ever could.

A standing seam stands 25 mm. A batten can go to 60 mm and be 40 to 50 mm wide. From the street that is not a slightly bigger rib, it is a different building.

Three pieces, not two

The batten sits on the deck between the pans. It is timber or folded metal, whichever suits the job, and both are ordinary on our work.

Each pan turns up against the batten on its side and stops clear of it, so the metal can expand without loading the joint. Nothing is fixed through the face of the pan.

A separate cap is folded over the top and locked down onto both upstands. That cap is the waterproofing and the visible line at once.

The spacing is the decision

Nothing about this system sets your pan width. There is no standard module to design around, because the batten spacing is yours to choose. We recommend keeping pans under 550 mm and custom sizes are ordinary, but the spacing is a design decision before it is a technical one.

That is the reason to specify it. Change the spacing and you change the scale of the elevation. Hold it constant and you get rhythm. Vary it deliberately across a facade and the building reads differently from each end.

It is also the reason batten seam takes longer on the drawing board than on the roof. Where the battens land decides where every pan is cut, and that is settled before anything is folded.

Pitch and substrate

Minimum roof pitch is 3 degrees, though 7 degrees or steeper is preferred and we will say so. The deck is 18 mm structural plywood over a waterproof membrane, with the structure and insulation by others.

Batten size and spacing are set out with the architect and confirmed against the site’s wind loads. That is a real calculation, not a house standard, and it tightens on a corner zone or at height.

Heritage and new work

Batten roll is the oldest folded metal roof there is. It is the detail on a great deal of nineteenth century work, which is why it turns up on restorations, and the same geometry gives a new building a grain nothing else matches.

We fold both the caps and the pans in our own workshop, so the batten height, the cap width and the pan module can be set to suit what is already on the building rather than to suit a product off a shelf.

Questions we get asked

Timber or metal battens? Both work and we use both. Timber is the traditional answer and is straightforward on a plywood deck. A folded metal batten keeps the whole assembly in one material family, which some specifications prefer.

How deep can the line go? Up to about 60 mm high on a batten 40 to 50 mm wide. Deeper than that and the cap starts to need its own support.

Can batten seam run down a wall? Yes, and onto a soffit. Battens can carry from a roof plane down a wall and across a soffit as one continuous line, which is how a form gets to read as a single object.

What is the minimum pitch? 3 degrees, with 7 degrees or steeper preferred. Below 3 we would rather put a double lock standing seam on it.

Which metals? Zinc, copper, aluminium and Colorbond or UniCote steel. Zinc and copper are the usual choices on feature work, because a deep shadow line rewards a metal that changes with the light.

Is it more expensive than standing seam? Usually, yes. There are three pieces instead of two, the battens are an extra trade item, and the setting out takes longer. What you buy for that is a line no other system produces.

Start your next project.

Send drawings or a brief. Concept sketches are enough to get a useful answer.

  1. You send drawings or a brief

    A plan, a section and an elevation are enough.

  2. 1business day

    An estimator replies

    Named contact, not a queue.

  3. 7days

    Tender returned

    Priced by system, metal and area.